AMONG COMPLETED PROJECTS

2017

  • Petronas RAPID Package 14 – Integration of 1200 units manifold & transmitter and perform leak test.
  • Nucleonic Profiler Installation & Hook-Up at FPSO Kikeh – To install, lay, termination of nucleonic profiler cable including OTDR and splicing work of fiber optic cable.
  • FGS Mapping implementation and H2 Detector for Bekok C
  • Design and install I2P converter
  • To Supply Labor, Tools, Transportation – To Fabricate, Install & Painting Work.
  • Provision of Engineering, Procurement, Construction, Installation of Wellhead Platforms, Associated Pipelines and Tie-Ins for Zawtika Development Project Phase 1C, Myanmar.
  • Optional item Welding Machine, Plasma Cutting Machine, Oxy Cutter & Power Supply Cable
  • Flow Computer Spare for SMPC and SPMB Allocation Meter
  • Provision of Engineering, Procurement, Construction, Installation of Wellhead Platforms, Associated Pipelines and Tie-Ins for Zawtika Development Project Phase 1C, Myanmar
  • Integration of Transmitter with Manifold Valve, Leak Test & Repacking
  • Integration, Leak Test and Repacking for Yokogawa Transmitter with Swagelok Manifold Valve
  • To perform Level Switch Servicing and Functional Check at Kapar Power Plant.

2016

  • Installation of the Level Switch at Pump Room for FPSO Kikeh – design functional and perform wiring for control circuit. Installation at site including fabricate secondary structure for junction box installation, pulling cable and install cable tray as well as the mounting bracket.
  • Electrical building Installation for new development – perform installation of entire building electrical system
  • Modification and upgrading LV switchboard, MEPA platform – Perform modification of physical and functionality of the motor control. Supply and install all related equipment for upgrading purposes.
  • Petronas RAPID RGT – Integration of 81 units manifold & transmitter and perform leak test
  • Petronas RAPID Package 16B Water Treatment – Integration of 240 units manifold & transmitter and perform leak test.
  • Petronas RAPID Package 1 – Integration of 1000 units manifold & transmitter and perform leak test.

2015

  • Modification and upgrading work, replacement of obsoleted ACB with new model at FPSO Bunga Kertas
  • Relocation of 6 units Steam Turbine Junction Boxes for FPSO Kikeh – fabricate secondary structure for junction box installation, pulling cable and install cable tray as well as the mounting bracket.

2012-2014

  • Manpower supply of HV termination with Ex and HV Test for Turbine, Water Injection Pump and Compressor at FPSO Kikeh.
  • Provision of 11kv HV jointer – Perform HV termination cable including repair work and investigation of defect cable.
  • HV and LV Termination for New Transformer at FPSO Kikeh – Perform HV termination cable including repair work and investigation of defect cable.
  • HV Termination at Turret FPSO Kikeh – Perform HV termination cable including repair work and investigation of defect cable.